Cigré

CIGRE (International Council on Large Electric Systems) er en non-profit international forening bosat i Frankrig med interesse i højspændingstransmission. CIGRE har både individuelle og kollektive medlemmer - ialt ca. 9100 medlemmer fra 90 lande fra alle 5 kontinenter.

CIGRE (International Council on Large Electric Systems) er en non-profit international forening bosat i Frankrig med interesse i højspændingstransmission. CIGRE har både individuelle og kollektive medlemmer - ialt ca. 9100 medlemmer fra 90 lande fra alle 5 kontinenter.

Cigre har i Danmark pt. 53 personlige medlemmer og 9 kollektive medlemmer.

Lige nu er følgende arbejdsgrupper under opbygning (TORs findes i den grå kasse til højre):     

    • WG D1.71_Understanding and mitigating corrosion

    • JWG C1_C6.37_CIRED_Optimal transmission and distribution investment decisions under increasing energy scenario uncertainty

    • WG D2.42_Synchronization and time distribution in communication networks for time-sensitive distributed operational applications

    • WG B2.68_Sustainability of OHL conductors and fittings–Conductor condition assessment and life extension

    • WG A1.60_Guide on economic evaluation for refurbishment or replacement decisions on hydro generators

    • WG B3.49_Review of substation busbar component reliability

    • WG A1.61_Survey of Partial Discharge Monitoring in Large Motors

    • WG C3.17_Interactions between Wildlife and Emerging Renewable Energy Sources and associated Insulated Cables

    • WG C1.38_Valuation as a comprehensive approach to asset management in view of emerging developments

    • WG B2.67_Assessment and Testing of Wood and Alternative Material Type Poles

    • WG D2.44_Usage of Public or Private Wireless Communication Infrastructures for Monitoring and Maintenance of Grid Assets and Facilities

    • WG C1.40_Planning Coordination between Syst Op T&D-Frameworks, Methods, and Allocation of Costs and Benefits

    • WG C1.39_Optimal power system planning under growing uncertainty

    • WG B1.61_Installation of HV Cable Systems

    • OPDATERET!! JWG C2_B4.38_Capabilities and requirements definition for Power Electronics based technology for secure and efficient system operation and control (pdf, 156kB)

    • WG D1.69_Guidelines for test techniques of High Temperature Superconducting (HTS) systems

    • WG A1.59_Survey on Industry Practices and Effects associated with the Cutting Out of Stator Coils in Hydrogenerators

    • WG B1.60_Maintenance of HV Cable Systems

    • JWG C2_B4.38_Capabilities and requirements definition for Power Electronics based technology for secure and efficient system operation and control

    • WG A3.39_Application and field experience with Metal Oxide Surge Arresters

    • WG B1.58_Condition Assessment and Diagnostic Methods to support Asset Management of MV Cable Networks

    • WG A2.58_Installation and Pre-Commissioning of Transformers and Shunt Reactors

    • WG A2.59_On-Site Assembly, On-Site Rebuild, and On-Site High Voltage Testing of Power Transformers

    • WG C4.45_Measuring techniques and characteristics of fast and very fast transient overvoltages in substations and converter stations

    • JWG C1/С4.36_Review of Large City & Metropolitan Area power system development trends taking into account new generation, grid and information technologies.

    • WG D1.68_Natural and synthetic esters - Evaluation of the performance under fire and the impact on environment

    • WG C5.25_Regulation & Market design perspectives raised by new storage technologies

    • JWG B5-C4. 61_Impact of Low Inertia Network on Protection and Control

    • WG B5.60_Protection, Automation and Control Architectures with Functionality Independent of Hardware

    • WG B5.64_Methods for Specification of Functional Requirements of Protection, Automation, and Control

    • WG B5.63_Protection, Automation and Control System Asset Management

    • WG B5.62_Life Cycle Testing of Synchrophasor Based Systems used for Protection, Monitoring and Control

    • WG D2.43 Enabling software-defined networking for Electric Power Utilities’ telecom applications

    • WG C5.22_The Management of Systemic Market Risk in Electricity Markets

    • WG C5.23_Wholesale Market Price Caps

    • WG C5.24_Exploring the Market-based value of Smart Grid developments

    • WG D1.70_Functional properties of modern insulating liquids for transformers and similar electrical equipment

    • WG B3.48-Asset health indices for equipment in existing Substations

    • WG C4.44_EMC for Large Photovoltaic Systems

    • WG B4.76 DC-DC converters in HVDC Grids and for connections to HVDC systems

    • WG B4.75_Feasibility Study for assessment of lab losses measurement of VSC valves

    • WG B3.47-Application of Robotics in Substations

    • WG B3.46_Guidelines for Safe Work Methods in Substations

    • WG B4.74_Guide to Develop Real-Time Simulation Models (RTSM) for HVDC Operational Studies

    • WG C2.17_Wide Area Monitoring Systems – Support for Control Room Applications

    • WG C4.28_Extrapolation of measured values of power frequency magnetic fields in the vicinity of power links

    Er du interesseret i detaljeret information om en af arbejdsgrupperne, eller ønsker du at kandidere som deltager i en af arbejdsgrupperne, så skriv til Susanne Schuster på sls@danskenergi.dk

      For medlemskab kontakt Susanne Schuster på SLS@danskenergi.dk.

      Personligt medlemskab: Kr. 1.150 DKK /år

      Kollektivt medlemskab for en undervisningsinstitution: Kr. 5.500 DKK/år

      Kollektivt medlemskab for en virksomhed: Kr. 11.000 DKK/år

      Cigrés Danske Nationalkomité består af:

      Jørgen S. Christensen (formand), Dansk Energi / DEFU
      Søren Ranneries, Dong Energy A/S
      Steen Beck Nielsen, Energinet.dk
      Joachim Holbøll, DTU Elektro
      Claus Leth Bak,  Aalborg Universitet, Energiteknologi
      Philip Carne Kjær, Vestas Technology R&D
      Peter Weinreich-Jensen, Siemens A/S